Bathroom rebuild
Were still at Deaton Marine for I’ve taken on a contracting
job to rebuild the half bath that is off from the office area. Karen wants it
to be both a bathroom and have a larger storage area than she currently has. It’s a small area only 4 x 8 feet but in regards
to the amount of work that it requires a small area is almost the same as a
larger one, you still have to do all the same things to each: new walls,
electrical, sub floor, tile floor, paint, trim, etc. On top of that there was
no room for a conventional door so I built a pocket door into the wall. Here’s
the pile of walls and junk that I ripped out. This is the pocket door framed. After
the walls were in the electrical need to be redone and a now tile floor
installed. Finally, the toilet, cabinet, shelf’s and trim go in and POOFF! We
have a new bathroom/closet after 8 days of intense work while offshore in the
Atlantic, a 5 day weather window perfect for sailing straight to the Bahamas
slipped by. Oh well, the things that we do in our chase for the mighty dollar.
Now it’s time to work on the goose.
We also went into New Bern for “art walk”. An evening where
the art galleries stay open for your convince. Lots of great art around town
and this interesting sign… not quite sure what it wants me to do.
No comments:
Post a Comment